Power Maximizing Control for Excavation

Methods and systems related to operating an excavator during a digging cycle are described. In some embodiments, a nominal path of a bucket connected to one or more linkages of the excavator may be commanded. A correction to the commanded nominal path may be applied to maximize a power applied by at least one of the one or more linkages of the excavator during at least a portion of the digging cycle.

Researchers

Filippos Sotiropoulos / Haruhiko Asada

Departments: Department of Mechanical Engineering
Technology Areas: Industrial Engineering & Automation: Manufacturing & Equipment
Impact Areas: Advanced Materials

  • automated control for excavators
    United States of America | Granted | 11,248,365
  • automated control for excavators
    Patent Cooperation Treaty | Published application

License this technology

Interested in this technology? Connect with our experienced licensing team to initiate the process.

Sign up for technology updates

Sign up now to receive the latest updates on cutting-edge technologies and innovations.